Help
Login
Busy
Search
epSOS - Issues

 
Select object
 
falsehide
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
119 Multiplicity in EntrySimpleObservation Closed Normal Change Request 2015-11-26 15:19:25
 
 M1 
 
Change Request Multiplicity in EntrySimpleObservation
Id epsos-issue-119
Status Closed
Priority Normal
Last Tracking 2015-11-26 15:19:25  by  Dr. Kai U. Heitmann
Current Labels
    
 (M1) Milestone 1 
    
Concerns
Template
false
Simple Observation (1.3.6.1.4.1.19376.1.5.3.1.4.13)
/
/
Template 1.3.6.1.4.1.19376.1.5.3.1.4.13 (2013-12-20) Simple Observation
Status Draft
/
-
/
-
Events
Tracking Closed 2015-11-26 15:19:25 : Tracking by Dr. Kai U. Heitmann
    
 M1 
Description
Done as planned
Tracking In Progress 2015-11-26 15:16:52 : Tracking by Dr. Kai U. Heitmann
    
 M1 
Description
The definitions are aligned with IHE PCC and the generic CDA model
interpretationCode CE CWE 0..* R
methodCode CE CWE 0..* R
targetSiteCode CD CWE 0..* R
Tracking Open 2015-11-25 18:24:50 : Tracking by Libor Seidl
    
 M1 
Description
Finding:
Following elements have minimal multiplicity set to 1 (and are Required)  although the description assumes "if there is ..." or "may be used ...". 

-
interpretationCode, methodCode targetSiteCode, author

Following elements have maximal multiplicity set to ..* which do not make sense to me (and will complicate any implementation). Moreover the MS Word specification do not state how to handle such multiplicities (seems to me like the author expected ..1 ):

- EffectiveTime, Value, interpretationCode, methodCodetargetSiteCode


Suggestion:

- change multiplicity to 0..1 and remove the Requirement

Further explanation:

-

    
Labels
Preview Code HTML color Display Name Description
 
 TBA 
TBA TBA To be approved
To be discussed and approved
 
 M1 
M1 M1 Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2 M2 Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3 M3 Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4 M4 Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJ WJ Changes Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TID TID Template ID
Template-ID changes throughout the specification