Help
Login
Busy
Search
epSOS - Issues

 
Select object
 
falsehide
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
16 Value set epSOSPregnancyInformation without dataset binding Closed Normal Request for Information/Education 2013-11-28 15:24:49 Alexander Henket
 
Request for Information/Education Value set epSOSPregnancyInformation without dataset binding
Id epsos-issue-16
Status Closed
Priority Normal
Last Tracking 2013-11-28 15:24:49  by  Alexander Henket
Current Assignee Alexander Henket
    
Concerns
Value Set
false
epSOSPregnancyInformation (epSOSPregnancyInformation)
/
Name epSOSPregnancyInformation Display Name epSOSPregnancyInformation
Version 2013-06-03 Status Draft
Version Label 2.34 Id epSOSPregnancyInformation
Description
The Value Set is used to determine the patient's delivery date estimation
Source Codesystems
2.16.840.1.113883.6.1 Logical Observation Identifier Names and Codes http://loinc.org
Values
Level/Type Code Display Name Codesystem Description
0-L
11778-8
Delivery date estimated (clinical)
2.16.840.1.113883.6.1
0-L
11779-6
Delivery date estimated from last menstrual period
2.16.840.1.113883.6.1
0-L
11780-4
Delivery date estimated from ovulation
2.16.840.1.113883.6.1
Legenda: Type L=leaf, S=specializable, A=abstract, D=deprecated. NullFlavors to appear in @nullFlavor attribute instead of @code.
/
-
/
-
Events
Tracking Closed 2013-11-28 15:24:49 : Tracking by Alexander Henket
Description
Conceptually this is not really correct. Each of the codes represents a separate concept, but the bindings have been applied.
Assignment 2013-11-05 15:15:14 : Assigned To Alexander Henket by Alexander Henket
Description
Need to bind to the expected date of delivery itself rather than the conceptList
Tracking Open 2013-10-16 13:52:13 : Tracking by Alexander Henket
Description
Issue:

This value set does not have a clear binding to anything in the dataset. Advice needed for mapping.

    
Labels
Preview Code HTML color Display Name Description
 
 TBA 
TBA TBA To be approved
To be discussed and approved
 
 M1 
M1 M1 Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2 M2 Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3 M3 Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4 M4 Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJ WJ Changes Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TID TID Template ID
Template-ID changes throughout the specification