Help
Login
Busy
Search
epSOS - Issues

 
Select object
 
false
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
240 moodCode shall be INT In Progress Normal Change Request 2017-11-24 13:36:16 Christof Gessner
 
 TBA 
 
Change Request moodCode shall be INT
Id epsos-issue-240
Status In Progress
Priority Normal
Last Tracking 2017-11-24 13:36:16  by  Christof Gessner
Current Assignee Christof Gessner
Current Labels
    
 (TBA) To be approved 
    
Concerns
Template
false
Entry Medication FulFillment Instructions (1.3.6.1.4.1.19376.1.5.3.1.4.3.1)
/
/
Template 1.3.6.1.4.1.19376.1.5.3.1.4.3.1 (2013-12-20) Entry Medication FulFillment Instructions
Status Draft
/
-
/
-
Events
Assignment 2017-11-24 13:36:16 : Assigned To Christof Gessner by Christof Gessner
    
 TBA 
Tracking In Progress 2017-11-24 13:36:15 : Tracking by Christof Gessner
    
 TBA 
Edited by Christof Gessner ( 2017-11-24 13:36:51 )
Description
Finding:

-

There is an inconsistency between the specification with OID 1.3.6.1.4.1.19376.1.5.3.1.4.3.1 in the older EXPAND documentation (where the implementation guides were written in paper) where the old validator was based upon and the current ART-DÉCOR definitions.

Suggestion:

- Change to moodCode=INT

Further explanation:

- I checked the PDF documentation, the parent template from IHE PCC 1.3.6.1.4.1.19376.1.5.3.1.4.3.1, and the C-CDA template 2.16.840.1.113883.10.20.1.43

(see https://art-decor.ihe-europe.net/art-decor/decor-templates--IHE-PCC-?id=1.3.6.1.4.1.19376.1.5.3.1.4.3.1 )

Also see IHE PCC TF2  6.3.4.8.4:
 <act  classCode='ACT' moodCode='INT'>
The  related  statement   is  the  intent   (moodCode='INT')  on  how  the  related  entry  is  to  be 
performed.


    
Labels
Preview Code HTML color Display Name Description
 
 TBA 
TBA TBA To be approved
To be discussed and approved
 
 M1 
M1 M1 Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2 M2 Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3 M3 Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4 M4 Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJ WJ Changes Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TID TID Template ID
Template-ID changes throughout the specification