Loading...
Help
Login
Busy
Search
epSOS - Issues
 
Select object
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
62Relationship between the type of obs.code and type of obs.value OpenNormalRequest for Information/Education2016-07-13 14:53:06Giorgio Cangioli
 
 TID 
 
Request for Information/EducationRelationship between the type of obs.code and type of obs.value
Idepsos-issue-62
StatusOpen
PriorityNormal
Last Tracking2016-07-13 14:53:06  by  Giorgio Cangioli
Current AssigneeGiorgio Cangioli
Current Labels
    
 (TID) Template ID 
    
Concerns
Template
Social History Observation (1.3.6.1.4.1.19376.1.5.3.1.4.13.4)
/
/
Template1.3.6.1.4.1.19376.1.5.3.1.4.13.4 (2013-12-20) Social History Observation
StatusDraft

/
-
/
-

Events
TrackingOpen2016-07-13 14:53:06: Tracking by Giorgio Cangioli
    
 TID 
TrackingOpen2016-03-29 12:37:39: Tracking by Dr. Kai U. Heitmann
    
 M3 
    
 TID 
Description
Add additional constraints by adding specialized templates for each situation; The Social Hository Entries need to be spilt up into different sub-specialized templates (3 to 8 new ones).
TrackingOpen2016-03-17 17:40:56: Tracking by Giorgio Cangioli
    
 M3 
    
 TBA 
Description
to be discussed with the team
Assignment2015-11-18 16:54:43: Assigned To Giorgio Cangioli by Giorgio Cangioli
    
 M2 
TrackingOpen2015-11-09 15:50:27: Tracking by Giorgio Cangioli
Description
Finding:

The description derived fro the IHE PCC template doesn't clarify if the type of values (e.g. PQ instead of CE) and the units used (e.g. {packs}/wk) is a reccomandation or a constrain

Suggestion:

Clarify this and in case define a constrain that specify that.

Further explanation:

-

    
Labels
PreviewCodeHTML colorDisplay NameDescription
 
 TBA 
TBATBATo be approved
To be discussed and approved
 
 M1 
M1M1Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2M2Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3M3Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4M4Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJWJChanges Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TIDTIDTemplate ID
Template-ID changes throughout the specification