Loading...
Help
Login
Busy
Search
epSOS - Issues
 
Select object
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
264Add effective time element to Social History ObservationClosedNormalChange Request2018-03-26 17:19:16Mathias Ghys
 
 TBA 
 
Change RequestAdd effective time element to Social History Observation
Idepsos-issue-264
StatusClosed
PriorityNormal
Last Tracking2018-03-26 17:19:16  by  Mathias Ghys
Current AssigneeMathias Ghys
Current Labels
    
 (TBA) To be approved 
    
Concerns
Template
Social History Observation (1.3.6.1.4.1.19376.1.5.3.1.4.13.4)
/
/
Template1.3.6.1.4.1.19376.1.5.3.1.4.13.4 (2013-12-20) Social History Observation
StatusDraft

/
-
/
-

Events
TrackingClosed2018-03-26 17:19:16: Tracking by Mathias Ghys
    
 TBA 
Description
This topic was discussed at the Semantic WG tcon on 26/3/2018 and this is what has been decided:
In the CDA IGs: we restrict the effectiveTime to onlyan interval (through the low/high subelements) and we don't allow a specific timestamp (through the value attribute) anymore. We improved the description and hope it will be more clear and less confusing.
Clinically it is meaningful, since it doesn't make sense to specify a single day for smoking behaviour or alcohol consumption.
As a consequence, we only have to foresee the display of the low/high subelements in the CDA Display tool.
Assignment2018-02-23 14:01:06: Assigned To Mathias Ghys by Mathias Ghys
    
 TBA 
TrackingOpen2018-02-23 14:01:05: Tracking by Mathias Ghys
    
 TBA 
Edited byMathias Ghys (2018-02-23 14:09:42)
Description
Finding:

- The Social History Observation is a specialization of the general Observation template. The general Observation template contains an effectiveTime, so I would expect the Social History Observation template to also contain the effectiveTime element

Suggestion:

- Add the effectiveTime element to the Social History Observation template

Further explanation:

-

    
Labels
PreviewCodeHTML colorDisplay NameDescription
 
 TBA 
TBATBATo be approved
To be discussed and approved
 
 M1 
M1M1Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2M2Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3M3Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4M4Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJWJChanges Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TIDTIDTemplate ID
Template-ID changes throughout the specification